PROMOTING ACCESS TO AFRICAN RESEARCH

West African Journal of Industrial and Academic Research

Log in or Register to get access to full text downloads.

Remember me or Register



An Assessment Of The Effectiveness Of Collaborative Cost Reduction Model As A Control Approach To Sluggish Migration From IPV4 To IPV6 In Nigeria

EC Nwosu, RVE Ejiofo

Abstract


This paper presents the effects of Collaborative Cost Reduction Model (CCRM) as a control Approach to reduce the high cost implication that causes the slow pace of migration process from IPV4 to IPV6 in Nigeria. This study reveals that CCRM can be applied to achieve Cost Reduction in collocation efforts in communication industries and this can reduce the cost for installation of infrastructure through sharing to avoid clustering the streets with masts. It provides an innovative transition approach that should catalyze migration process from IPV4 to IPV6 in Nigeria.

Key words: IPV4, IPV6, Collaborative Cost Reduction Model, innovative transition, migration




AJOL African Journals Online